Berendrecht lock
For the common access of both locks, the southern quay walls of the Zandvliet Lock were demolished and recycled, ultimately allowing about 80,000 m³ of rubble to be incorporated into the concrete to be manufactured for the new lock. This recycled concrete was applied as 'mass concrete' in certain segments of the retaining walls and at the approach to the access channel.
Kamp C
During construction, recycled concrete granulates were used for the less critical structural elements.
Center for durable construction Heusden-Zolder
During the renovation of the old mine buildings in Zolder, a number of floor sections were constructed with concrete containing mixed rubble.
Office building VMM Aalst
At the request of the principal, concrete with recycled granulates (rubble from the old St. Lieven's Hospital) was used to the extent possible.
Villa Grobbendonk
The concrete for the foundation trenches and the floor slab was performed with a 100% and 30% replacement of the coarse proportion, respectively.
Bicycle road and farm road De Panne
Coarse granulates 100% replaced with high-quality concrete granulates.
Linear element Diksmuide
The construction of safety impact bumpers over a length of 700 m.
Bicycle road Engsbergen
Two test sections, one with 20% concrete granulates, and one with 40% concrete granulates.
Highway Zwijndrecht Melsele
First application of 60% recycled granulates in substrate.
TETRA project Nieuwpoort
During the TETRA project ReCycle, several pilot sections were constructed.
76 results